Preparation of electrical design for new and/or upgrading of electrical installation of high-rise residential and commercial buildings, substation equipment and facilities, protection and control panel layout and wiring diagrams
Consultancy services related to power system study, automation and integration, and medium and low voltage systems
Preparation of power system study and analysis using ETAP electrical power system design and analysis software for equipment evaluation, cable sizing & ampacity, load flow, voltage drop, panel studies & single phase systems, short circuit analysis, protective device coordination and sequence of operation
Automation of integrated substation equipment and devices including supervisory control and data acquisition (SCADA), data logging of meter reading, breakers and disconnect switch status, controls of breakers and disconnects, controls of on-load tap changers (OLTC) and monitoring of transformer installed devices and substation events
New SCADA System Master Station

Integration of substation devices such us protection & control relays, meters, circuit breaker controls, motorized disconnect controls and transformer monitors & controls
Installation and commissioning of pre-wired protection and control panels, meter panels, SCADA panels and other online substation monitoring devices
Standard commissioning and preventive maintenance testing of high, medium and low voltage generation, transmission and distribution substation and line equipment, the details of which are as follows:




These are special tests for high voltage power transformers, bushings, current and potential transformers. They are advanced tests considered as the "CT scan and MRI" in high voltage testing.
Injection of a sinusoidal excitation voltage with a continuously increasing frequency into one end of the transformer winding and measurement of the signal returning from the other end. The comparison of input and output signals generates a unique frequency response which can be compared to a reference data. Deviations indicate geometrical and/or electrical changes within the transformer. No additional data processing is required due to a direct measurement in the frequency domain.
Determination of the dielectric properties of insulation materials within a wide frequency band by analyzing the moisture content particularly in oil-paper-insulated power transformers, based on dissipation factor and capacitance.